Megaleio

2 towers, 57 slabs, Hyderabad, Steel Consumption: 4.5kg/sqft

Leisure Valley NBCC, Noida

10 towers, 40-50 slabs each, total built-up area: 70 lakh sq. ft.

Navanaami One

70 slabs with transfer, 20 m (basements) + 235 m (above ground), Steel Consumption: 4.9 kg/sq ft, total buit-up area: 14.3 lakh sq. ft

Team4 Nyla

40 slabs, total built-up area: 2.6 lakh sq ft

NBCC East Delhi Hub

tallest building in Delhi, 50 slabs, Steel consumption: 4.5 kg/sq ft

Namishree BP Twin Towers

BPS Twin Towers (3B+G+22), Hyderabad, Steel Consumption: 3 kg/sq ft

Windsor Court By Assotech Limited

6 towers, 16-27 slabs, total built-up area:3.3 lakh sq. ft

Wave Eligo


3 towers, S+8, total project area: 1.83 lakh sq. ft

Supernova By Supertech

Tallest building in Delhi NCR, 72 slabs, total built-up area: 70 lakh sq. ft

F Premiere

3 towers, 30 floors, total project area: 2.17 lakh sq ft

Saffron360 Trishala

1 tower, 37 floors, total built-up area: 6.25L sq. ft.

Trilok Trishala

5 towers, 25 floors, total built-up area: 15.21L sq. ft.

Wave Eden

4 blocks, 14 floors, total project area: 2.26 lakh sq. ft

Emaar Gurgaon Greens

27 towers, 14 floors, total project area: 5.9 lakh sq. ft

Emaar Imperial Gardens

9 towers, 14 floors, total project area: 5.2 lakh sq. ft

Emaar Palm Drive

14 towers, 18 floors, total project area: 16.5 lakh sq. ft

Makuta Horizon

1 tower, 16 floors, total project area: 50k sq. ft

Makuta Nirvana

8 towers, 14 floors, total project area: 3 lakh sq. ft

Makuta Myspace 2

6 blocks, 15 floors, total project area: 2.5 lakh sq. ft

Krish Aura

5 towers, 14 floors, total project area: 2 lakh sq. ft